
Decks Built on Framing That Outlasts the Boards.
Pressure-treated, cedar and composite decks with footings below the frost line, joists at the right span and hardware that will not rust out.
- Licensed & insuredMA HIC #212825
- Written, itemized estimateFree, no obligation
- One in-house crewNo rotating subs
- Reply within one business dayCall or text anytime

Why Monteiro
Anyone Can Screw Down Boards. The Frame Is the Job.
A deck fails from the bottom up: shallow footings that heave in a New England freeze, joists spanned too far, ledger boards fastened into siding instead of framing. We build the structure to code and get it inspected, then the surface goes on.
You get a design sized to how you use the space, the permit filed for you, and inspections at footing and framing.
What’s included
Decking Scope
- Pressure-TreatedThe workhorse build: cost-effective, code-compliant, and finished cleanly instead of left rough.
- Composite & PVCComposite boards with hidden fasteners, so there are no screw heads and nothing to sand every spring.
- CedarNatural cedar decking and railing for houses where the look matters as much as the span.
- Footings & FramingFootings below the frost line, properly sized joists, and a ledger flashed and bolted into structure.
- Railings & StairsCode-height railing, correct baluster spacing, and stairs with consistent rise and run.
- Lighting & Under-DeckRiser and post lighting, plus usable space underneath when the deck is high enough.
How a project runs
5 Stages, In This Order.
Walkthrough & Design
We look at grade, door heights and how you want to use the space, then size the deck to it.
Estimate & Permit
Itemized estimate with the decking material named. We file the permit: a deck is structural, and your town wants to see it.
Footings & Inspection
Holes dug below the frost line and inspected before any concrete goes in. This stage decides the deck’s lifespan.
Framing & Ledger
Ledger flashed and bolted to structure, joists set, and a framing inspection booked before decking covers it.
Decking, Railing & Final
Boards, railing, stairs and lighting, then a final inspection and a walkthrough with you.
Pricing
What Drives the Cost
Every house is different, so we price after seeing it. These are the factors that move a decking estimate the most:
- Size, height above grade and number of levels or stairs
- Decking and railing material: pressure-treated, cedar or composite
- Footing count and soil or ledge conditions
- Removal of an old deck and any repair to the house rim where the ledger attaches
- Extras: lighting, built-in benches, skirting, under-deck drainage
You get all of it itemized in writing, with allowances spelled out, before anything starts.




Common questions
Before You Sign Anything.
Do I need a permit for a deck?
In practically every Greater Boston town, yes: a deck is structural. We file it and meet the inspector at the footing and framing stages. An unpermitted deck becomes your problem when you sell.
How deep do the footings have to go?
Below the frost line, which in this area generally means about four feet. The building department sets the exact requirement. Shallow footings heave when the ground freezes and thaws, and that is what pulls a deck away from the house.
Composite or pressure-treated?
Composite costs more up front and gives you back the yearly sanding and staining. Pressure-treated costs less and needs maintenance. Both are solid when the framing underneath is right.
How long does a deck take?
Usually one to two weeks of on-site work once the permit is issued. The permit and the footing inspection set the actual start.
Can you build on top of my existing frame?
Only if it is sound. We open it up and show you the ledger and joists before recommending it. Re-decking a bad frame is money spent on a deck that still fails.
Are you licensed and insured?
Yes. Massachusetts Home Improvement Contractor registration #212825, with liability insurance and workers’ compensation. We send current certificates before you sign.
Also from Monteiro
Need Another Trade?
Free estimate
Free Estimate. No Obligation.
Tell us what you are planning. We reply within one business day to set up a free walkthrough, then send a written, itemized estimate.
- Call(781) 428-0662
- Text a photo of the job(781) 428-0662
- Emailmonteiroconstruction@gmail.com
- Licensed & insuredMA HIC #212825
Request received
Thanks. Here is what happens next:
- We review your project and reply within one business day.
- We schedule a free walkthrough at your home.
- You get a written, itemized estimate. No pressure to sign.
In a hurry? Call (781) 428-0662 or send a text.