Dark gray clapboard siding with white trim
Siding · Greater Boston

Siding That Takes a New England Winter.

Vinyl, fiber cement and cedar, installed over house wrap that is detailed right. Most siding failures start with the flashing behind it, so we treat that as the job.

  • Licensed & insuredMA HIC #212825
  • Written, itemized estimateFree, no obligation
  • One in-house crewNo rotating subs
  • Reply within one business dayCall or text anytime
Home with new shingle and board-and-batten siding at dusk

Why Monteiro

What Goes On Behind It Is What Keeps It Dry.

Siding is the part you see. The water management behind it decides whether your sheathing is sound in ten years. We tear off, inspect what is underneath, and fix rot before anything new goes up, instead of covering it and moving on.

Your estimate names the product and includes a written allowance for any rot we find, so the number does not change by surprise mid-job.

9+Years in business
93+Projects completed
18Towns served
#212825MA HIC registration

What’s included

Siding Scope

  • Vinyl SidingInsulated and standard profiles, locked and nailed to spec so panels expand without buckling.
  • Fiber CementJames Hardie–style board and panel, cut and fastened to the manufacturer’s spec so the warranty holds.
  • Cedar & Wood ShingleNatural and pre-finished shingle and clapboard, coursed straight and left to breathe.
  • House Wrap & FlashingWeather-resistive barrier, window and door flashing, kick-out flashing at the roof line.
  • Trim, Soffit & FasciaPVC and composite trim, corners and soffit detailed to close the envelope.
  • Rot RepairSheathing and framing replaced where the tear-off finds damage, priced before we proceed.

How a project runs

5 Stages, In This Order.

  1. Walkthrough & Measure

    We measure the elevations, look at your current flashing details, and talk through material and color.

  2. Estimate & Materials

    An itemized estimate with the material named, plus a written allowance for any rot behind the old siding.

  3. Tear-Off & Inspection

    Old siding comes off and we inspect the sheathing. If something is wrong back there, you see it before it gets covered.

  4. Wrap & Flashing

    House wrap, then window, door and roof-line flashing. This is the layer that does the actual work.

  5. Siding, Trim & Cleanup

    Panels and trim go on, we run a magnet over the yard for nails, and we walk the job with you.

Pricing

What Drives the Cost

Every house is different, so we price after seeing it. These are the factors that move a siding estimate the most:

  • Material: vinyl, fiber cement or cedar, and the profile you choose
  • Number of stories and how easy it is to stage around the house
  • Layers to remove, and whether old siding contains asbestos shingle
  • Rot in sheathing or trim found during tear-off
  • Trim, soffit and window details included in the scope

You get all of it itemized in writing, with allowances spelled out, before anything starts.

Dark gray clapboard siding with white trim
Shingle and board-and-batten siding on a completed exterior
Gray shingle siding on a rear elevation
Blue clapboard siding across a two-story rear elevation

Local service

Siding Across Greater Boston

Town-by-town notes on housing stock, permits and what we plan for:

Common questions

Before You Sign Anything.

Do you remove the old siding first?

Yes. We tear off instead of siding over the top. Going over old siding hides whatever is failing underneath and adds thickness that throws off window and door trim.

What happens if you find rot?

We stop, show you what we found, and price the repair before continuing. Your estimate includes a written allowance for this, so it is not a surprise number invented mid-job.

Vinyl, fiber cement or cedar: which should I pick?

It depends on budget, the style of the house and how much maintenance you want. We walk you through what each one costs to install and to live with, and we will tell you when the cheaper option is the right call.

How long does a siding job take?

Most single-family homes run one to two weeks of on-site work, weather permitting. Tear-off and wrap happen fast; trim details take the time.

Will the manufacturer warranty still be valid?

Only if the product is installed to spec, which is why we follow it. We hand over the manufacturer documentation along with our own workmanship warranty in writing.

Are you licensed and insured?

Yes. Massachusetts Home Improvement Contractor registration #212825, with liability insurance and workers’ compensation. We send current certificates before you sign.

Also from Monteiro

Need Another Trade?

Free estimate

Free Estimate. No Obligation.

Tell us what you are planning. We reply within one business day to set up a free walkthrough, then send a written, itemized estimate.

Request Your Free Estimate

Takes about a minute. We reply within one business day.

Best way to reach you

No obligation. Your details are never sold or shared.

Request received

Thanks. Here is what happens next:

  1. We review your project and reply within one business day.
  2. We schedule a free walkthrough at your home.
  3. You get a written, itemized estimate. No pressure to sign.

In a hurry? Call (781) 428-0662 or send a text.

Call Text Estimate