Renovated kitchen with custom cabinetry and quartz counters
Kitchens · Greater Boston

A Kitchen Down for Weeks, Not Months.

Cabinets, counters, plumbing, electrical and tile, sequenced so the trades arrive in the right order and your kitchen comes back on schedule.

  • Licensed & insuredMA HIC #212825
  • Written, itemized estimateFree, no obligation
  • One in-house crewNo rotating subs
  • Reply within one business dayCall or text anytime
Renovated kitchen with island and custom cabinetry

Why Monteiro

Kitchens Stall on Scheduling, Not on Skill.

Kitchen projects rarely drag because of the tile work. They drag because cabinets were ordered late, the countertop cannot be templated until the boxes are set, and the electrician shows up a week after he was needed. We order long-lead items first and sequence around them.

Demolition starts only when cabinets and appliances are confirmed, so you are not living without a kitchen while waiting on a delivery.

9+Years in business
93+Projects completed
18Towns served
#212825MA HIC registration

What’s included

Kitchen Renovation Scope

  • CabinetryStock, semi-custom and custom boxes, set level and scribed to walls that are never actually straight.
  • CountertopsQuartz, granite and solid surface, templated after cabinets are set so the fit is right the first time.
  • PlumbingSink, dishwasher and fixture runs, including moving supply and waste when the layout changes.
  • ElectricalCircuits for appliances, outlets to current code, under-cabinet and recessed lighting.
  • Tile & BacksplashBacksplash and floor tile, laid out so cut tiles land where you do not look first.
  • Flooring & TrimNew flooring run properly into adjoining rooms, plus toe kick, crown and finish trim.

How a project runs

6 Stages, In This Order.

  1. Design & Layout

    We work through the layout, appliance sizes and how you cook before anything is ordered.

  2. Estimate & Ordering

    Itemized estimate, then cabinets and appliances ordered right away. These set the whole schedule.

  3. Demolition

    Protection down, old kitchen out, and anything hidden behind the walls surfaced while it is still cheap to address.

  4. Rough-In

    Plumbing and electrical moved to the new layout and inspected before walls close up.

  5. Cabinets & Counters

    Boxes set and leveled, then the countertop templated to what is installed, not to a drawing.

  6. Tile, Trim & Final

    Backsplash, trim, fixtures and appliances, then a walkthrough and your punch list before we call it done.

Pricing

What Drives the Cost

Every house is different, so we price after seeing it. These are the factors that move a kitchen renovation estimate the most:

  • Layout changes that move plumbing, gas or electrical
  • Cabinet line: stock, semi-custom or custom
  • Countertop material and edge details
  • Condition of the walls, wiring and drains once opened
  • Appliances, lighting, tile and flooring included in the scope

You get all of it itemized in writing, with allowances spelled out, before anything starts.

Custom cabinetry and quartz counters
Kitchen cabinetry and appliances
Kitchen island and cabinetry

Local service

Kitchen Renovation Across Greater Boston

Town-by-town notes on housing stock, permits and what we plan for:

Common questions

Before You Sign Anything.

How long will I be without a kitchen?

For a straightforward renovation with cabinets already on site, plan on several weeks without a kitchen. Cabinet lead time and the countertop, which cannot be templated until the boxes are in, drive the schedule.

When do I need to pick everything out?

Cabinets and appliances before we start, because they set the schedule. Tile, fixtures and hardware can follow, and we tell you the date each decision is needed.

Do I need a permit?

If plumbing or electrical moves, yes, and that is most kitchens. We file it and handle the inspections. A cosmetic swap with no relocation sometimes does not, and we will tell you which one yours is.

Can you set up a temporary kitchen?

We can usually rig a sink, fridge and microwave elsewhere in the house. Ask at the walkthrough so it is planned instead of improvised on demo day.

What if you find something behind the walls?

Old wiring, failed plumbing and water damage do turn up. We stop, show you, and price it before continuing, never after.

Are you licensed and insured?

Yes. Massachusetts Home Improvement Contractor registration #212825, with liability insurance and workers’ compensation. We send current certificates before you sign.

Also from Monteiro

Need Another Trade?

Free estimate

Free Estimate. No Obligation.

Tell us what you are planning. We reply within one business day to set up a free walkthrough, then send a written, itemized estimate.

Request Your Free Estimate

Takes about a minute. We reply within one business day.

Best way to reach you

No obligation. Your details are never sold or shared.

Request received

Thanks. Here is what happens next:

  1. We review your project and reply within one business day.
  2. We schedule a free walkthrough at your home.
  3. You get a written, itemized estimate. No pressure to sign.

In a hurry? Call (781) 428-0662 or send a text.

Call Text Estimate